Project Cost: $2.4 Billion
Project Duration: 2025 – 2029 (Estimated 4-Year Timeline)
Primary Contractor: Blue Diamond Contracting
Scope of Work:
Structural reinforcement and modernization
Seismic retrofitting for earthquake resilience
Ventilation and air quality system upgrades
Full lighting and safety system modernization
Intelligent traffic management system
New emergency exits and expanded safety infrastructure
Tunnel Length: 1.7 miles
Estimated Workforce: Over 1,200 workers at peak activity
Materials Used:
150,000 tons of reinforced concrete
120 miles of upgraded electrical and fiber optic lines
250,000 square feet of fire-resistant safety panels
Key Benefits:
75+ year service life extension
= Improved emergency response access
Reduced traffic congestion and emissions
Environmental Measures:
Eco-friendly materials sourcing
Advanced stormwater drainage upgrades
Dust and emissions control protocols during construction
Economic Impact:
Estimated $15.6 billion in future economic benefits over 30 years
Supports direct and indirect job creation across the state
The Braddock Tunnel Revitalization Project represents a landmark $2.4 billion investment in the future of San Andreas’ critical infrastructure.
Originally constructed in the early 20th century, the Braddock Tunnel has long served as one of the state’s most vital transportation corridors — connecting the northern agricultural and industrial regions with the bustling southern cities and ports. Over the decades, the tunnel has withstood the weight of time, traffic, and natural disasters, but now demands a bold modernization to meet the growing demands of the 21st century.
Today, under the leadership of Blue Diamond Contracting, in partnership with the San Andreas Department of Transportation and key federal agencies, the Braddock Tunnel is being brought back to life. This revitalization is a comprehensive overhaul that blends cutting-edge engineering with environmentally responsible innovation, ensuring the tunnel remains a safe, efficient, and resilient artery for generations to come.
Project Scope Includes:
Structural Reinforcement: Full lining replacement and reinforcement of the tunnel walls and ceiling to exceed modern safety standards.
Seismic Retrofitting: Installation of advanced earthquake-resistant systems to protect against even the most severe seismic activity.
Ventilation and Air Quality: Modernization of the tunnel’s aging ventilation systems to dramatically improve air quality, reduce pollution, and enhance traveler health and safety.
Lighting and Electrical Systems: Full LED lighting retrofit, emergency lighting upgrades, and integration of new energy-efficient electrical infrastructure.
Traffic Safety Systems: Deployment of intelligent traffic management systems, including dynamic signage, emergency communication networks, and automated incident response sensors.
Emergency Access and Egress: Creation of additional emergency exits, evacuation routes, and reinforced escape corridors to meet and exceed modern tunnel safety regulations.
Drainage and Stormwater Systems: Advanced flood mitigation systems to protect against heavy rainfall and extreme weather events.
The Braddock Tunnel Revitalization Project is not simply about repairing an aging structure — it is about future-proofing one of San Andreas' most important transportation assets.
By modernizing the tunnel, this project will:
Enhance the daily commute for thousands of motorists
Improve statewide logistics and supply chain reliability
Strengthen emergency response capabilities in case of natural disasters
Contribute to San Andreas’ broader sustainability and emissions reduction goals
Stimulate job creation and economic growth for surrounding communities
Blue Diamond Contracting brings to this project a deep commitment to excellence, innovation, and public trust. With a legacy of completing major infrastructure projects on time and within budget, we are proud to lead the effort to reshape the Braddock Tunnel into a model of modern engineering and environmental stewardship.
When complete, the revitalized Braddock Tunnel will serve as a shining example of San Andreas’ ability to honor its historic foundations while forging a path toward a safer, smarter, and more connected future.
The construction and transportation sectors face mounting challenges — including rising equipment maintenance costs, extended downtime for repairs, and the environmental impact of aging fleet vehicles.
For Blue Diamond Contracting, these pressures have made the need for a modern, self-sufficient Fleet Services Division clear.
The new division will allow us to:
Minimize Downtime: Centralizing maintenance and repair operations will ensure faster turnaround times and keep our fleet operational.
Enhance Safety Standards: With dedicated bays and specialized tools for heavy haul and HAZMAT vehicles, we will exceed current safety requirements for critical sectors.
Improve Cost-Efficiency: Reducing reliance on third-party service providers will lower operational costs and improve overall fleet readiness.
Promote Sustainability: By adopting advanced diagnostic technologies and incorporating eco-friendly facility practices, we’re building a cleaner, greener future.
Project Value: $50,000,000
Location: Los Santos, San Andreas
Status: Under Construction
As part of Blue Diamond Contracting’s ongoing commitment to excellence and innovation, we are proud to announce the development of our new Fleet Services Division, centered around a state-of-the-art 50,000-square-foot facility in Los Santos.
This cutting-edge facility is being purpose-built to accommodate a full range of vehicles and heavy equipment, supporting everything from light-duty trucks to specialized heavy haul and HAZMAT fleet units.
Key features include:
A 50,000-square-foot, climate-controlled workspace designed for full-service fleet maintenance and repair.
State-of-the-art diagnostic and repair technology, enabling faster, more precise servicing of critical equipment.
Energy-efficient systems, including smart lighting, water recycling, and solar energy integration, aligning with Blue Diamond Contracting’s long-term sustainability goals.
The Los Santos Fleet Services Facility is expected to significantly strengthen Blue Diamond Contracting’s operational efficiency, fleet readiness, and environmental stewardship.
This project is not just an investment in our company — it's an investment in the future of transportation and infrastructure across San Andreas.
Stay tuned for construction updates and official opening announcements.